Skip to main content
Head office: 1355 London Road, London SW16 4BE
Covering London, Surrey and surrounding counties Residential and commercial work

Guide · Electrical

Electrical installation certificates, EICR and Part P: different purposes

Each one proves something different. An Electrical Installation Certificate, or a Minor Works Certificate for small jobs, records that new work was tested to BS 7671. An EICR reports on the condition of an existing installation. Part P evidence, from a registered electrician's scheme or from building control, shows that notifiable work meets the Building Regulations.

New consumer unit with circuit breakers (illustrative)
New consumer unit · illustrative Fig. 01

Several documents can follow electrical work, and each answers a different question. A certificate records new work. A condition report records the state of an existing installation. A Building Regulations certificate records that notifiable work went through a legal route. A buyer's solicitor, building control and a tenant may each ask for a different one.

This guide explains each document, what Part P makes notifiable, which document fits which job, and landlords' five-year checks. It applies to England. Wales has a wider list of notifiable work[3], and Scotland uses its own building standards system[6].

Which document is which?

The table compares the five documents. The first two certify new work. The third reports on an existing installation. The last two are the Building Regulations evidence for notifiable work.

Electrical documents compared

Document What it answers Typical work Who issues it
Electrical Installation Certificate Does the new work meet BS 7671, the wiring regulations?[6] A new circuit, a new consumer unit, a rewire or a new installation[2][9] The electrician who did the work, to the person who ordered it[4]
Minor Works Certificate Was a small addition or alteration tested and found safe?[3] An extra socket or light point on an existing circuit, outside a bathroom[1] The electrician who did the work[3]
Electrical Installation Condition Report (EICR) What condition is the existing installation in?[8] A periodic check: a landlord's five-year inspection, or before buying, selling or letting[7][10] An electrically competent inspector, such as a registered electrician[7]
Building Regulations compliance certificate Does notifiable work meet the Building Regulations?[6] Notifiable work self-certified by a registered electrician, or checked by a third-party certifier[4] The installer or its registration body, within 30 days of completion[4]
Completion certificate or final certificate Does notifiable work meet the Building Regulations?[4] Notifiable work that was notified to building control before it started[4] Council building control (completion certificate) or a private approver (final certificate)[4]

Scroll sideways to see all columns

Two distinctions matter most. An EICR is a report, not a certificate[8]. An installation certificate shows that the work meets the wiring standard. The compliance certificate shows that it meets the Building Regulations[6]. Notifiable work needs both.

The Electrical Installation Certificate

BS 7671 is the UK national standard for electrical installations[6]. Approved Document P says electrical work should be inspected and tested to the procedures in BS 7671. A registered installer should complete a BS 7671 certificate for every job and give it to the person who ordered the work[4].

The full certificate covers new circuits, new installations and consumer units[2][9]. A consumer unit replacement in a home is notifiable and must get an Electrical Installation Certificate[9]. Before it is replaced, the existing equipment and the earthing and bonding must be found adequate[9].

A similar check applies to any addition. Only the new work has to meet current standards, but the existing installation is checked first, including its earthing and bonding. It need not be upgraded unless the new work would make it less safe, or its condition would stop the new work running safely[4].

The Minor Works Certificate

Its full name is the Minor Electrical Installation Works Certificate. It is the shorter form for small jobs on an existing circuit, such as an extra socket or light point. The Planning Portal says electricians doing non-notifiable work should give you one, to show they have tested the work for safety[3]. A consumer unit replacement is not minor work: it needs the full certificate[9].

Non-notifiable work is still regulated. Like notifiable work, it should be designed, installed, inspected, tested and certificated to BS 7671. Councils can take enforcement action against non-notifiable work that is unsafe and does not comply[3]. Bathrooms differ. Adding a light point close to a shower is notifiable even though it adds no circuit[1].

The Electrical Installation Condition Report (EICR)

An EICR assesses the condition of an existing installation in use. It measures it against the edition of BS 7671 current at the time of the inspection[8]. It records damage, wear, defects, dangerous conditions and anything that falls short of the current standard[7]. Each observation gets one of four codes[8]:

  • C1, danger present. There is a risk of injury, and immediate remedial action is needed.
  • C2, potentially dangerous. Urgent remedial action is needed.
  • C3, improvement recommended. A recommendation only, not a requirement[11].

  • FI, further investigation. The inspector could not settle a code without looking further.

Any C1 or C2 makes the overall result unsatisfactory. A report with only C3 observations can still be satisfactory[8].

Electrical Safety First recommends an inspection every 10 years for an owner-occupied home and every five years for a rented one. It also advises one before buying, selling or letting[7]. For an owner-occupier that is a recommendation. You do not need an EICR to sell a house[11].

The Building Regulations compliance certificate

This is the Part P evidence for notifiable work[6]. Which document you receive depends on the route the work took[4]:

  • Registered electrician. The installer, or its registration body, must give the occupier a copy of the compliance certificate within 30 days of the work being completed. The details also go to building control[4]. If the certificate does not arrive, contact the electrician's registration body[2].

  • Third-party certifier. The certifier's registration body issues the compliance certificate in the same way, within 30 days[4].

  • Building control. Once satisfied that the work complies, the council issues a completion certificate, or a private approver issues a final certificate[4].

A new consumer unit, for example, should come with an Electrical Installation Certificate and a Building Regulations Compliance Certificate[11].

What does Part P make notifiable in England?

Part P is the part of the Building Regulations that covers electrical safety in homes. It requires electrical installations to be designed and installed to protect people from fire or injury[4]. It was introduced for England and Wales in 2005[6]. The current Approved Document P took effect in England on 6 April 2013[4]. It cut the range of notifiable work, and kitchens and outdoor spaces came out of it[6].

In England, notifiable work is[1][4]:

  • A new or replacement consumer unit, also called the fuse box.
  • A complete new circuit, such as a ring or lighting circuit, or a new circuit for a cooker, shower or immersion heater.
  • An addition or alteration to an existing circuit in a special location. In a room with a bath or shower, that is the space up to 2.25 metres above the floor and within 0.6 metres of the bath or shower tray[4].

Most repairs, replacements and maintenance jobs are not notifiable. Nor are additions or alterations to existing circuits outside a special location[1]. Notifiable work has two main routes.

Route 1: a registered electrician self-certifies

An installer registered with a competent person scheme can self-certify that the work complies with the Building Regulations[1]. No building control application is needed. The authorised schemes for electrical work in homes include Certsure, trading as NICEIC, and NAPIT. Members of electrical schemes appear on the Electrical Competent Person Register, so you can check a name before work starts[5].

Route 2: building control is told before work starts

An installer who is not registered must notify a building control body before work begins[4]. That can be the council's building control, or a private registered building control approver[2]. The body decides how much inspection and testing is needed, from the nature of the work and the installer's competence. It also takes into account any BS 7671 certificate the installer gives it, and can ask for evidence of the installer's qualifications[4].

England has also allowed a third option since April 2014. An installer who is not registered can appoint a registered third-party certifier before the work starts, instead of using building control[2][4]. So the rules do not require every electrical job to be done by a registered electrician. They require notifiable work to take one of these routes, and expect all work to be done and tested to BS 7671[3].

Which document does each job need?

Most jobs need an installation certificate. If the work is notifiable, they need the Building Regulations evidence as well. The common cases:

  • Extension with a new circuit or consumer unit. Notifiable. An Electrical Installation Certificate, plus a compliance certificate or a building control certificate[1][2].

  • Extension wired from an existing circuit, outside a bathroom. Not notifiable in England. A Minor Works Certificate for the addition[1][3].

  • Rewire. New circuits throughout, so notifiable. An Electrical Installation Certificate and the Building Regulations evidence[1][6].

  • Kitchen. A new cooker circuit is notifiable. An extra socket on an existing kitchen circuit is not, because a kitchen is not a special location[1].

  • Buying, selling, letting or an older house. No new work, so no installation certificate. An EICR describes the condition of the installation[7].

On an extension, settle the route at the start, not at handover. For self-certification, confirm the electrician's registration before work begins. For building control, the notice has to be given before the work starts[4].

Landlords: the five-year inspection

Private landlords in England have a legal duty under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020. The fixed electrical installation must be inspected and tested at least every five years, or sooner if the inspector decides a shorter period is needed[10]. The document for this check is the EICR, and tenants should be given a copy[10][11].

An unsatisfactory report means remedial work on the coded items: immediately for a C1, urgently for a C2[8]. Repairs are new work, with their own certificate. A notifiable repair, such as a new circuit or consumer unit, also needs a Building Regulations route[1].

How certification works on an E&N Build Group job

At handover you receive the certificates and sign-offs that apply to the work done. For electrical work, the list above shows which documents apply to each kind of job. Building Control submissions can be arranged through us, or you can appoint your own designer to make them.

Before work starts, ask any electrician three things: the scheme they are registered with, the route the notifiable work will take, and the certificates you will receive. A scheme registration can be checked on the Electrical Competent Person Register[5].

Next steps

Before electrical work starts, settle three things: whether any of it is notifiable, which route will certify it, and which certificates you will receive. For electrical work as part of an extension, loft or kitchen, see electrical work for building projects. Electrical work can also be booked as a standalone job. The site visit and the written quotation are free, and neither commits you to anything.

FAQ

Questions people ask about electrical paperwork.

What is Part P?

Part P is the part of the Building Regulations that covers electrical safety in homes in England and Wales. It requires electrical installations to be designed and installed so that people are protected from fire and injury. In England, three kinds of work are notifiable: a new consumer unit, a complete new circuit, and additions or alterations close to a bath or shower. Other work is not notifiable but should still meet BS 7671.

What certificate should I get after electrical work?

For new work, an Electrical Installation Certificate, or a Minor Works Certificate for a small addition to an existing circuit. Both confirm the work was tested to BS 7671. If the work was notifiable, you should also get the Building Regulations evidence: a compliance certificate within 30 days through a registered electrician, or a completion or final certificate from building control. A new consumer unit should come with both kinds of document.

Is an EICR the same as an electrical certificate?

No. An Electrical Installation Condition Report is a report on the condition of an existing installation, not a certificate for new work. It lists what the inspector found and gives each observation a code: C1, C2, C3 or FI. Any C1 or C2 makes the overall result unsatisfactory. Repairs or new circuits that follow an inspection are new work, so they get their own certificate.

Does electrical work in an extension need Part P notification?

It depends on the work, not on the extension. A new circuit or a new consumer unit is notifiable in England, and so is any addition or alteration close to a bath or shower. Extending an existing circuit into the room, outside a bathroom, is not notifiable, though it should still be tested and certificated. Notifiable work is either self-certified by a registered electrician or notified to building control before it starts.

What should I do if I did not get a certificate?

Ask the electrician first. A new consumer unit or other notifiable work should come with an installation certificate and a Building Regulations compliance certificate. If the compliance certificate has not arrived within 30 days, contact the electrician's registration body. If you doubt the electrician was registered at all, check with the scheme they named. Electrical Safety First then suggests an EICR from a registered electrician to check the work.

How often does a rented home need an EICR?

In England, private landlords must have the fixed electrical installation inspected and tested at least every five years, under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020. The inspector can set a shorter interval. Tenants should be given a copy of the report. For an owner-occupied home, Electrical Safety First recommends an inspection every 10 years, but that interval is a recommendation only.

Do I need an EICR to sell my house?

No. Electrical Safety First says you do not need an EICR to sell a property, though one can reassure a buyer. The paperwork that matters more is for past notifiable work, which should have been certified when it was done. Gather the installation certificates and the Building Regulations certificates before you sell. Contact the installer's registration body about any compliance certificate that is missing.

Sources

Where the rules above come from.

Official sources checked on 1 October 2026. Fees and permitted development limits change; the dates show when each was read.

  1. Planning Portal,
    Electrics: building regulations, general information
    (accessed 1 Oct 2026)
  2. Planning Portal,
    Electrics: building regulations, checking for safety
    (accessed 1 Oct 2026)
  3. Planning Portal,
    Electrics: building regulations, minor works
    (accessed 1 Oct 2026)
  4. GOV.UK (HM Government),
    Approved Document P: Electrical safety, dwellings (2013 edition)
    (accessed 1 Oct 2026)
  5. GOV.UK,
    Competent person scheme: current schemes and how schemes are authorised
    (accessed 1 Oct 2026)
  6. Electrical Safety First,
    Part P of the Building Regulations
    (accessed 1 Oct 2026)
  7. Electrical Safety First,
    Periodic inspection and testing
    (accessed 1 Oct 2026)
  8. Electrical Safety First,
    Best Practice Guide 4: Electrical installation condition reporting (Issue 7.4)
    (accessed 1 Oct 2026)
  9. Electrical Safety First,
    Best Practice Guide 1: Replacing a consumer unit in domestic premises (Issue 5.2)
    (accessed 1 Oct 2026)
  10. Electrical Safety First,
    Best Practice Guide 10: Electrical safety standards in private rented accommodation (Issue 1.2)
    (accessed 1 Oct 2026)
  11. Electrical Safety First,
    Your questions answered
    (accessed 1 Oct 2026)

Planning electrical work?

Electrical work can be booked as a standalone job, and the certificates that apply to the work done are handed over at the end.