To choose a builder, check who they are, what insurance and registrations they hold for your kind of work, and what past customers say. Then compare written quotes and agree a written contract before you pay anything. Walk away from anyone who pushes for a quick decision, takes cash only or will not put a price in writing.

Terraced house with scaffold and a plain skip at the start of building work (illustrative)
Before the work starts · illustrative Fig. 01

Many building disputes start before the work does. The price was never written down, the scope was vague, or nobody checked who the builder was. The checks that prevent this are free, and most take a few minutes online.

This guide takes them in order: who the business is, its insurance and registrations, its past customers, its quote and its contract. It then lists the questions to ask at the first visit and the warning signs that mean you should stop.

What to have ready before you contact builders

Builders can only quote like for like if they are pricing the same job. Write a short brief and give it to each builder. Bromley Council's trading standards team advises the same: prepare a clear, detailed brief, then get at least three written quotes[10].

  • A written brief. The address, the work, the finish you expect and any fixed dates.
  • Drawings, if you have them. Without them, each builder defines the scope on site, and the quotes differ more.
  • The approvals position. Which approvals the job may need, and who will apply for them.

Checks before you hire: who they are, insurance and registrations

Four checks come before any price. The table shows where to verify each one, and the steps below explain what to look for.

The checks at a glance

Check Where to verify it What to ask for Warning sign
Company details The Companies House register, free online[1] The full company name and a permanent trading address Status shown as dissolved, or a name or address that does not match the quote
Insurance The policy documents themselves[2] Employer's liability and public liability cover, with dates[3] No policy to show, or cover that ends before your job will
Registration for controlled work The competent person scheme's own register[2] The scheme name and the certificate you will receive "No need for Building Control" without a named scheme
Gas work The Gas Safe Register, online or by phone[6] The engineer's Gas Safe ID card No card, or a card that does not list the work
Scheme or trade association The scheme's own register[2] The membership the builder claims A logo the scheme's register does not confirm
Past customers Phone calls or visits[2] Two or three recent jobs like yours Written references only, with no one to call

Scroll sideways to see all columns

1. Confirm who you are dealing with

Ask for the full business name, a permanent address and a landline. Be wary of a trader who gives only a mobile number, because they may be hard to contact if problems come up[2]. If the builder is a limited company, search for it on the Companies House register. Basic details are free, including the registered office address, the status, such as live or dissolved, the filing history, the officers and any insolvency information[1]. Check that the name and address match the quote.

The register has limits. Companies House says its service is not intended to be comprehensive, and it cannot always closely review each document it receives[1]. A clean record shows that the company exists, not that its work is good.

2. Check the insurance, and ask to see it

Employer's liability insurance covers injury or disease to the builder's own employees. Most employers must hold it by law, with cover of at least £5 million. Calling a worker self-employed does not settle who counts as an employee, and nor does their tax status[3]. Public liability insurance covers claims by members of the public or other businesses, and it is generally voluntary[3]. It is the cover for you and the builder if someone is hurt or property is damaged[2].

Ask to see the policies, and check that they will not run out before your job is finished[2]. Whoever carries out the work, the certificates it should produce are the ones the Building Regulations and the competent person schemes require, and the sections below say which to ask for.

3. Check registrations for the work you need

Some work is controlled by the Building Regulations even when it needs no planning permission. GOV.UK lists replacing a fuse box and electrics, installing a bathroom with plumbing, replacing windows and doors, and installing or replacing a heating system among the jobs that need approval. You do not need to get approval yourself if you use someone registered with a competent person scheme[4]. Ask which scheme, then check the installer on that scheme's register.

Electrical work shows how precise the rule is. Notifiable work in a home is a new circuit, a replacement consumer unit, or an addition or alteration to circuits in a special location, such as near a bath or shower. It is certified by an electrician registered with a competent person scheme or by a registered third-party certifier, or it is notified to a building control body before work begins[5]. Ask which route applies and which certificates you will receive. Without approval, you will not have the certificates of compliance you may need when you sell[4].

Gas is stricter. By law, gas engineers working in the UK must be Gas Safe registered. Ask to see the engineer's ID card, which shows a licence number, an expiry date and the types of gas work they can do. Check it on the register, and do not let anyone without a valid card start the work[6].

Quality schemes and trade associations add to these checks; they do not replace them. TrustMark is a UK government-endorsed quality scheme for work in or around the home, and the Department for Business and Trade has suggested that consumers consider checking for it[7]. Whatever body a builder names, check the membership on that body's own register rather than trusting a logo[2].

4. Speak to past customers and see past work

Ask for two or three recent jobs like yours, with contact details. Phone or visit, because written references are not always genuine[2]. Ask whether the job finished when it was meant to, how changes were handled and whether they would use the builder again. If you can, see a finished job in person: plaster edges and tile joints show more than photographs do.

Quotes: comparing like with like

5. Get written quotes, not estimates

A quote is a fixed price, so you know what the work will cost. An estimate is a rough guess, and you might end up paying more. Try to get written quotes from at least three builders before you decide[2]. Each quote should give:

  • a fixed total price, not a daily rate;
  • a breakdown of the work and the materials, with separate costs for each part;
  • whether the price includes VAT;
  • how long the price is valid, and when it can go up[2].

Compare the scope line by line before you compare the totals. Be cautious if one price is a lot lower than the rest[2]: something may be missing, such as waste removal or making good. Where a contract neither fixes a price nor says how it will be fixed, the law entitles the builder only to a reasonable price[8], which leaves room for argument. The guide to reading a builder's quote explains provisional sums, exclusions and how to set two quotes side by side.

Contract and payment: get it in writing

6. Agree a written contract

Put the agreement in writing before work starts. It should say exactly what you are paying for and record everything you have agreed, such as timings, tidying up, materials and payments[2].

The Consumer Rights Act 2015 adds terms of its own. The builder must carry out the work with reasonable care and skill. What they say or write about the work is part of the contract if you take it into account when deciding to go ahead. If no time is fixed, the work must be done within a reasonable time[8]. Writing the promises down still avoids an argument about what was said.

Where you sign matters too. A contract made in person at your home, rather than at the builder's business premises, is usually an off-premises contract. You can then cancel within 14 days without giving a reason, and the builder must tell you about that right. If they do not, the period is extended by up to 12 months. Work can start within the 14 days only if you expressly ask, on paper, by email or in a similar lasting form. If you then cancel, you normally pay a proportionate amount for the work done. These rules do not apply to contracts for the construction of new buildings, or of substantially new buildings by converting existing ones[9].

If you are comparing us with other builders, how we work shows what you get in writing before work starts: a written scope stating what is included, what is not, and what is provisional because it cannot be known until the work opens up, with the quotation.

7. Agree how and when you will pay

Avoid builders who want everything upfront, and keep any deposit as low as you can. If a deposit is needed, ask whether the builder has insurance to protect it. Paying in stages means problems can be put right before you make the final payment[2]. Tie each stage to work you can see is finished, not to a date. Paying by credit or debit card may let you get money back through the card provider if something goes wrong[2].

Questions to ask a builder before hiring

Ask every builder the same questions, and compare the answers side by side:

  1. Who will run the job day to day, and who do I call if there is a problem?
  2. Which parts of the work will you subcontract, and to whom?
  3. Can I see your employer's liability and public liability policies?
  4. Which schemes will certify the electrics, windows or heating, and which certificates will I receive?
  5. Who will deal with Building Control and book the inspections?
  6. Can I speak to recent customers with jobs like mine?
  7. What does the price exclude, and how are changes priced?
  8. What is the payment schedule, and what work triggers each payment?

Vague answers on insurance, certificates or payment are a reason to keep looking.

Red flags: when to walk away

  • A knock on the door. Bromley Council's trading standards team advises residents not to deal with doorstep traders[10].

  • Pressure to decide. Its February 2026 alert describes doorstep roofers who put up scaffolding at the earliest opportunity to create urgency, then rapidly escalate the scope and the price. Question any trader who claims they can start today[10].

  • Cash only, or everything upfront. Either is a sign the trader might be dishonest or unreliable[2].

  • Nothing in writing. No written quote, no written contract, or only a daily rate[2].

  • A price far below the rest. It might mean the trader lacks the right skills or experience, or is not being honest[2]. Something may also be missing from the scope.

  • Claims that do not check out. A logo, a policy or a company record that the register or the policy itself does not confirm.
  • "You don't need Building Control." Controlled work needs approval or a registered installer, or you may lack the certificates you need to sell[4].

What you should have before work starts

By the time you sign, you should hold a short file for the job: the company check, the insurance policies, the registrations you checked, your notes from the references, the written quote and the signed contract. Add each certificate as the controlled work is finished, and keep the file with the house's papers for when you sell.

FAQ

Questions people ask before hiring a builder.

How do I check if a builder is legitimate?

Start with the basics. Get the full business name, a permanent address and a landline. If the business is a limited company, search the free Companies House register to confirm it is live and that the address matches the quote. Then ask to see the insurance certificates, check any scheme membership on the scheme's own register, and speak to two or three recent customers. No single check is enough on its own.

What questions should I ask a builder before hiring?

Ask who will run the job day to day, what will be subcontracted, and to see the insurance certificates. Ask which schemes certify the electrics and the windows, and who deals with Building Control. Ask for recent customers you can call, what the price includes and excludes, how changes are priced and what triggers each payment. Ask every builder the same questions, and compare the answers.

Does a builder need insurance?

Employer's liability insurance is compulsory for most employers, with cover of at least £5 million, so most builders with employees must hold it. Public liability insurance, which covers claims by members of the public or other businesses, is generally voluntary. Ask to see both policies anyway, check the dates run past the end of your job, and be wary of a builder who will not show them.

What is the difference between a quote and an estimate?

A quote is a fixed price for the work it describes, so you know what you will pay. An estimate is a rough guess, and the final bill can be higher. Ask for written quotes, ideally from at least three builders. Compare what each one includes and excludes before you compare the totals, and check how long each price is valid.

Can I cancel a building contract after signing it?

Often, yes. If you signed with the builder at your home, or anywhere other than their business premises, it is usually an off-premises contract, and you have 14 days to cancel without giving a reason. If you asked for work to start within that period and then cancel, you normally pay for the work done so far. The rules do not apply to contracts for new buildings, or for substantially new buildings made by converting existing ones.

How much deposit should I pay a builder?

As little as you can. Avoid paying for the whole job upfront, and if a deposit is needed, ask whether the builder has insurance that protects it. Stage payments tied to finished parts of the work are safer, because problems can be put right before the final payment. Paying by credit or debit card may let you get money back through the card provider if something goes wrong.

Is TrustMark worth checking?

It is one useful check. TrustMark is a UK government-endorsed quality scheme for work in and around the home, and the Department for Business and Trade has suggested that consumers consider checking for it. Membership does not replace the other checks. You still need the insurance certificates, the right registrations for controlled work, references you have spoken to and a written contract.

Sources

Where the rules above come from.

Official sources checked on 1 October 2026. Fees and permitted development limits change; the dates show when each was read.

Comparing builders?

The site visit and the written quotation are free, and neither commits you to anything.