Skip to main content
Head office: 1355 London Road, London SW16 4BE
Covering London, Surrey and surrounding counties Residential and commercial work

Guide · Window replacement

FENSA, CERTASS and building control: window replacement certificates explained

A window replacement certificate shows that new windows or doors meet the Building Regulations. It comes from one of two places: an installer registered with a competent person scheme, such as FENSA or CERTASS, or the building control body that approved the work. Keep it safe, because you may need it when you sell.

Newly fitted casement window in a made-good opening (illustrative)
Newly fitted window · illustrative Fig. 01

Replacing a window looks like a simple swap. In fact the Building Regulations have applied to all replacement glazing since 1 April 2002[1]. The new frames have to meet limits for heat loss, safety glass and ventilation, and in some rooms they must still allow escape in a fire. Someone has to confirm that they do. The certificate is the record of who did, and by which route.

This guide explains why replacement windows are controlled work, the two ways an installation is certified and which schemes cover windows and doors. It sets out what the certificate confirms, why it matters when you sell and what to do if it is missing. Planning permission is a separate question. New windows of a similar appearance to the originals do not usually need it. A listed building needs listed building consent, though, and an Article 4 direction can withdraw the usual rights[13].

Why are replacement windows controlled work?

GOV.UK lists replacing windows and doors among the work that needs Building Regulations approval[2]. The rules reach well beyond the glass: the Planning Portal lists thermal performance, safety, air supply, means of escape and ventilation[1]. Approved Document L treats windows, roof windows, rooflights and doors as controlled fittings, each to be well fitted and reasonably draught-proof[8].

What counts is replacing the whole unit. Approved Document K treats the replacement of a whole unit, meaning the frame and the glazing, as building work. Replacing the glazing while keeping the existing frame, for example as a repair, is not building work[11]. So a misted sealed unit swapped into a sound frame needs no certificate. A new frame does.

The two routes: a registered installer or building control

Which route applies depends on whether the installer is registered with a competent person scheme.

Route 1: a registered installer self-certifies

A registered installer is approved to carry out the work to comply with the Building Regulations without involving local authority building control[1]. GOV.UK puts it plainly: you do not need to get approval yourself if you use someone registered with a competent person scheme[2]. The installer, directly or through the scheme operator, tells the local authority about the work and issues your certificate[3][6].

Route 2: building control approves the work

If the installer is not registered, or you fit the windows yourself, approval comes from a building control body. That is the local authority or a registered building control approver[1]. The application goes in before work starts. LABC Front Door gives an additional window as an example of the small alterations a building notice suits[7]. Work can then start two days after the notice is submitted, without formal approval in advance[5]. The work is inspected, and if it is satisfactory you receive a completion certificate[7].

The two certification routes compared

Competent person scheme Building control
Who confirms compliance The registered installer self-certifies the work[1] The local authority or a registered building control approver[1]
Before work starts You check the installer is on the Competent Persons Register[3] A building notice or full plans application is submitted[5]
The document you receive A certificate showing the work was done by a registered installer[1] A completion certificate, once the work is found satisfactory[7]
When it arrives Within 8 weeks of completion[3] Once the work is found satisfactory; usually within 8 weeks of completion on a full plans application[5]

Scroll sideways to see all columns

Which schemes are authorised for windows and doors?

The Ministry of Housing, Communities and Local Government is in charge of authorising competent person schemes[4]. Its current list names six operators for replacement windows, doors, roof windows or rooflights: Blue Flame Certification, CERTASS, Certsure, FENSA, NAPIT and ASSURE[4]. All six are listed for existing homes, and for other existing buildings subject to an exclusion the list sets out[4].

FENSA and CERTASS are two names on that list, not separate legal requirements. A certificate from an authorised scheme can be used as evidence of compliance[3]. So you do not need a FENSA certificate by name. You need a certificate from one of the authorised schemes, or from building control.

Registration belongs to the installer, not to the windows. Before you sign, search the Competent Persons Register, which GOV.UK points to for checking that a tradesperson belongs to a scheme[3]. Check that the name and address on the register match the quotation.

What does the certificate confirm?

Compliance with the Building Regulations, as set out in the Approved Documents for use in England. Four areas matter on most jobs, plus one rule for front doors:

  • Heat loss (Part L). A replacement window should have a U-value no higher than 1.4 W/m²K, or a Window Energy Rating of band B or better. A rooflight has a limit of 2.2[8]. Where the character of the building has to be kept, a centre pane U-value of 1.2, or low-emissivity secondary glazing over single glazing, is accepted instead[8]. A new edition of Approved Document L takes effect on 24 March 2027 and keeps the same limit for windows[9].

  • Safety glass (Part K). Glazing people are likely to touch while moving about must break in a way unlikely to cause injury, resist impact without breaking, or be shielded from impact[11]. This applies in critical locations. They include any panel up to 800 mm from floor level and any glazed door up to 1,500 mm. Side panels within 300 mm of a door's edge count up to 1,500 mm too[1][11].

  • Escape in a fire (Part B). Where the old window would count as an escape window in a new house and is big enough for escape, the new one should give at least the same potential for escape. If the old opening was larger than needed, it can be reduced to the minimum[12]. That means an unobstructed openable area of at least 0.33 m², at least 450 mm high and 450 mm wide. Its bottom should be no more than 1,100 mm above the floor[12]. The rule matters for habitable rooms other than kitchens, on the ground floor and on upper floors up to 4.5 m above ground. A room with another escape route the guidance allows does not need one[12].

  • Ventilation (Part F). If the old windows had background ventilators, often called trickle vents, the new ones should have them too, no smaller and controllable[10]. If the old windows had none, new windows are likely to make the house more airtight. The guidance then sets minimum vent sizes: 8,000 mm² in habitable rooms and kitchens, and 4,000 mm² in bathrooms, unless another approach applies[10]. The aim is ventilation no worse than before the work[10].

  • Front doors. When the main entrance door of a home built since 1999 is replaced, the threshold should stay level[1].

When do you receive the certificate?

On the scheme route, the installer gives you a certificate within 8 weeks of completion[3]. On the building control route, the completion certificate comes from the building control body once it is satisfied with the work[7]. When it arrives, check that the address and the work described match what was installed. Keep it with the other papers for the house, such as planning decisions and certificates for electrical or heating work.

Why does the certificate matter when you sell?

GOV.UK is direct about this. Without approval you will not have the certificates of compliance you may need when you want to sell your home[2]. For replacement windows, the certificate is that proof. It shows which route was used and that the work was signed off. If you are buying, ask for the certificate for any windows replaced since 1 April 2002[1].

The risks go beyond the sale. The person doing the work could be prosecuted and fined if it does not comply with the Building Regulations. The building control body could also make you pay to fix faulty work[2]. If you expect to sell within a few years, gather the certificates now, while the installer is easy to reach.

What to do if a certificate is missing

  • It has not arrived yet. Allow the 8 weeks GOV.UK gives[3]. Then ask the installer. If that fails, LABC Front Door advises contacting the scheme operator the installer is registered with[6].

  • It has been lost. Ask the installer which scheme they belonged to at the time, and contact that operator. Self-certified work should also have been notified to the local authority[6], so its building control team is another place to ask.

  • The work was never certified. The route left is regularisation: retrospective approval for work already carried out without consent, from the local authority only. It is available for work carried out after 11 November 1985[5]. The work is inspected against the regulations in force when it was done[7], and you might need to make alterations before a certificate is given[5].

  • Only the glass was replaced. No certificate is needed, because replacing glazing in an existing frame is not building work[11].

  • The windows were fitted before 1 April 2002. No window certificate is expected, because the rules for all replacement glazing date from then[1].

What you receive at handover

Whichever route applies, at handover you receive the certificates and sign-offs that apply to the work done. Ask which route will be used before the work starts, so you know which document to expect.

Before you order: a short checklist

  1. Ask which route the job will follow. For the scheme route, note the scheme and check the installer on the Competent Persons Register[3].

  2. If the installer is not registered, agree in writing who submits the building control application before work starts[5].

  3. Check that the quotation covers the U-value, safety glass, trickle vents and escape openings where they apply.
  4. Check for a listed building or an Article 4 direction before ordering[13].

  5. Keep the certificate with the house's papers when it arrives.

Window replacement can be booked with us as a standalone job, and the site visit and written quotation are free and commit you to nothing. Our window replacement services page explains the work itself.

FAQ

Questions people ask about window certificates.

Do I need a FENSA certificate for new windows?

Not a FENSA certificate as such. You need proof that the replacement windows met the Building Regulations. That can be a certificate from any of the six competent person schemes authorised for windows and doors, of which FENSA is one. Or it can be a completion certificate from building control. Windows replaced since 1 April 2002 should have one or the other.

What is the difference between FENSA and CERTASS?

For the homeowner, very little. Both are competent person schemes authorised for replacement windows, doors, roof windows and rooflights, alongside four other schemes on the government's list. An installer registered with either can self-certify the work, and the certificate you receive is evidence of compliance. What matters is that your installer is registered with one of the authorised schemes.

Can I use building control instead of FENSA?

Yes. If your installer is not registered with a scheme, or you fit the windows yourself, apply to the council's building control service or a registered building control approver before work starts. A building notice is meant for smaller projects, and work can start two days after it is submitted. You receive a completion certificate once the work is found satisfactory.

How long does it take to get a window certificate?

GOV.UK says a registered installer will give you a certificate within 8 weeks of completion. They will also tell the local authority about the work on your behalf. If nothing has arrived by then, ask the installer first, then contact the scheme operator they are registered with. On the building control route, the completion certificate follows once the work has been found satisfactory.

What paperwork should I get for replacement windows?

The key document is the compliance certificate. It comes from the installer's competent person scheme, or as a completion certificate from building control. Keep the quotation or contract that describes the windows as well. If the property needed planning permission or listed building consent, keep that decision too. Together they show what was fitted and that it met the rules.

Do I need a certificate if only the glass is replaced?

No. Approved Document K says that replacing the glazing while keeping the existing frame, for example as a repair, is not building work. A new sealed unit in a sound frame therefore needs no certificate. Replacing the whole unit, meaning the frame and the glass, is building work. It needs either a scheme certificate or building control approval.

What if I am selling and have no window certificate?

First ask the installer, then the scheme operator they belonged to. If the work was never certified, you can apply to the local authority for regularisation. That is retrospective approval for work carried out after 11 November 1985. The work is inspected, and you might need to make alterations. GOV.UK warns that without approval you will not have the certificates of compliance you may need when you sell.

Do replacement windows need trickle vents?

If the old windows had them, yes. The new windows should include background ventilators no smaller than the originals, controlled by you or automatically. If the old windows had none, the guidance expects new windows to make the house more airtight. It then sets minimum vent sizes by room, unless the house has continuous mechanical extract or building control accepts another approach.

Sources

Where the rules above come from.

Official sources checked on 1 October 2026. Fees and permitted development limits change; the dates show when each was read.

Replacing your windows?

The site visit and written quotation are free, and at handover you receive the certificates that apply to the work.