Skip to main content
Head office: 1355 London Road, London SW16 4BE
Covering London, Surrey and surrounding counties Residential and commercial work

Fittings, electrics and plumbing

Electrical work for building and improvement projects

Electrical work within projects and as standalone jobs, including rewires. E&N Build Group handles the electrics that an extension, a loft, a kitchen or a media wall needs, and takes on electrical jobs on their own.

New brushed steel socket and switch on a freshly painted wall (illustrative)
New sockets and switches · illustrative Fig. 01
  • Within projects and standalone

    Extensions, lofts, kitchens, rewires

  • Certified work

    The paperwork that applies to your job

  • Free site visit and quote

    Written scope before anything is priced

  • London, Surrey and surrounding counties

    Coverage confirmed per project

What the work covers

Electrics planned with the build, not squeezed in after it.

On a building project the electrics are two visits: first fix, when cables, back boxes and circuits go in before the walls are boarded, and second fix, when sockets, switches, lights and the consumer unit connections are made once the plaster is dry. Because the electrical work is in our scope, it's sequenced with the plastering and the joinery rather than fitted around them.

As standalone work we take on rewires, consumer unit replacements, new circuits for kitchens and outbuildings, and additional sockets and lighting. The guide on signs your house needs rewiring helps you judge whether the installation is due an assessment. Two jobs where electrics are most of the work: kitchen electrics and media wall electrics.

At handover you receive the certificates that apply to the work done. Ask before the work starts which route the notifiable work will take and which certificate you will receive.

Typically part of the electrical work

  • Circuit design and consumer unit capacity for the new work
  • First fix: cabling, back boxes and containment before boarding
  • Second fix: sockets, switches, lighting, cooker and shower supplies
  • Testing, and the certificate the work requires
  • Making good after chasing, where it isn't already in the plastering scope

Coverage is confirmed per project: see the areas we cover for this work, and send the property postcode with your enquiry.

New ceiling lighting in a freshly plastered and painted room (illustrative)
New lighting · illustrative Fig. 02

To quote this job, tell us

  • What needs power or lighting, room by room
  • The age of the installation, and when the consumer unit was last changed, if you know
  • Whether it's part of a building project or a standalone job
  • Any existing certificates or reports you have
  • Whether the property is occupied during the work

A photo of the consumer unit tells us more about the installation than most descriptions.

Part P and certificates

What must be notified, and what you should receive.

In homes, Part P of the Building Regulations makes some electrical work notifiable: new circuits, consumer unit replacements and work in bathrooms among them. Notifiable work is either self-certified by an electrician registered with a competent person scheme or approved through Building Control, and you should receive an Electrical Installation Certificate or a Minor Works Certificate for the job. A condition report (EICR) is a different document: an assessment of an existing installation, not a certificate for new work. Electrical reports and certificates explained sets out which is which.

Cost

What affects the cost

What drives the cost of electrical work:

  • The number of circuits and points: sockets, lights, switches, spurs
  • Whether the consumer unit needs upgrading
  • First-fix access: open walls on a project cost less than chasing finished ones
  • Specialist supplies: cookers, showers, EV chargers, outbuildings
  • Testing and certification for the work

We don't publish prices, because two jobs that sound the same rarely cost the same. Every quotation follows a free site visit and comes with a written scope, so you can see exactly what is and isn't included. For what drives the price, read rewiring cost and what a rewire involves.

How we work

Four steps from first call to handover.

See the full process
  1. 01

    Enquiry

    Tell us the property, the work you have in mind and whether you already have drawings.

  2. 02

    Site assessment

    We visit, look at access and structure, and talk through the options with you. The visit is free.

  3. 03

    Scope and quotation

    A written scope that sets out what is included, and what isn't, before work starts. The quote is free.

  4. 04

    Build and handover

    The agreed work in the agreed sequence, then a handover with the documentation that applies to your job.

Related work

Common questions

Before you ask.

Do I get a certificate?

Yes, for any work that requires one. Ask before the work starts which route the notifiable work will take and which certificate you will receive.

Do you do rewires on their own?

Yes. Rewires and consumer unit replacements are taken on as standalone jobs as well as within refurbishments.

Can you do an EICR?

An EICR is a condition report on an existing installation rather than a certificate for new work. Ask and we'll tell you whether we can arrange one for your property.

Power where you need it?

Tell us what needs power or lighting and we'll plan the circuits with the build.

Request an electrical quote