For a landlord or managing agent, the void is a trade-off. Every empty week costs rent, but it is also the only time you have every room to yourself. The aim is a short void that leaves the property safe, compliant and ready to let.
This guide covers privately rented homes in England. The rules quoted are as official sources stated them on 1 October 2026, including the Renters' Rights Act changes that took effect on 1 May 2026[9].
What counts as a refurbishment between tenancies?
Most void works fall into three levels. A refresh covers cleaning, small repairs and redecoration. A renewal replaces worn items, such as flooring, kitchen units or bathroom fittings. An upgrade changes the home itself, for example with better insulation, new windows or a new layout. The level sets how long the property stands empty, which trades are needed and which approvals apply.
Whatever the level, you must keep the property safe and free from health hazards[6]. If a council finds a serious hazard, it can issue an improvement notice, fix the hazard and bill you, or stop you using all or part of the property[6].
What does the work usually include?
Condition at check-out decides most of the list. These are the usual candidates.
- Decoration. Make good the walls, repair damaged plaster and repaint. Plaster must dry before it is painted, so repairs go early.
- Flooring. Carpet, vinyl, laminate, tiles or wood. Check the subfloor once the old covering is up, because a new floor on a damp or uneven base fails early.
Kitchen refresh. New doors and worktops on sound units, or a full replacement. Keeping the sink and hob where they are keeps the services simple. Moving a gas hob is gas work. By law, anyone working on gas appliances and fittings as part of their business must be competent and registered with Gas Safe Register[13].
Bathroom refresh. Resealing, regrouting and new taps are often enough. Replacing a bath, toilet, basin or sink needs no Building Regulations approval, but electrical work around baths and showers does[11].
Electrics and plumbing. Most repairs and like-for-like replacements need no approval. Replacing a fuse box, a heating system or glazing units does[11].
- Windows and exterior. Failed sealed units and cracked render take longer to arrange, so decide on them before the tenant leaves.
How do you programme the void period?
Start the programme when notice arrives, not when the keys come back.
1. Use the notice period as planning time
Since 1 May 2026, assured shorthold tenancies have become assured periodic tenancies[9]. A tenant ends one by giving notice in writing. The most notice you can ask for is two months. Where the agreement says nothing, the tenant must give at least two months, ending on a rent day or the day before[7]. An earlier end can be agreed in writing[7].
2. Inspect before the tenant leaves
Arrange a visit during the notice period and walk every room with whoever will price the work. At the same visit, check the dates on the electrical report, gas safety record and EPC.
3. Fix the scope and order materials
Agree a written scope and order long-lead items, such as kitchen units and made-to-measure windows, before the tenant leaves. Mark anything you cannot see yet as provisional.
4. Sequence the trades
Strip out, then repair the structure, then the services, then plaster. Kitchen and bathroom fittings follow, then flooring, decoration and a final clean, so finished surfaces are not damaged.
5. Book the checks for the end of the void
Book the gas safety check after any gas work, so the record covers the finished installation, and any electrical inspection early enough to fix what it finds. Test every alarm after the decorators leave.
6. Collect the paperwork
Keep one file for the property: electrical report, gas safety record, EPC and certificates for void work. An installer registered with a competent person scheme self-certifies their work and gives you a certificate within 8 weeks of completion[12].
Which compliance checks fall due at changeover?
The table summarises the six items, and the sections below add what matters during a refurbishment.
Compliance checks at a change of tenancy (England)
| Item | What the rule requires | At changeover |
|---|---|---|
| Electrical installation | Inspection and testing by a qualified person at least every five years; the report is usually an EICR[1] | Copy to the new tenant before they occupy; no new test if the last was under five years ago and asked for no further work[1] |
| Gas appliances and flues | Annual gas safety check on each appliance and flue by a registered engineer[2] | Copy of the record to the tenant before they move in[2] |
| Smoke alarms | At least one on each storey with a room used as living accommodation[3] | In proper working order on the day the new tenancy begins[3] |
| Carbon monoxide alarms | In any room used as living accommodation with a fixed combustion appliance, excluding gas cookers[3] | In proper working order on the day the new tenancy begins[3] |
| Energy Performance Certificate | Needed to rent out a property and valid for 10 years[5]; rating of E or above unless an exemption is in place[4] | Confirm it is in date and at E or above before you let[4] |
| Written tenancy information | Written information about the key terms of the tenancy[8] | Given before the agreement is signed or the tenancy is agreed[8] |
Scroll sideways to see all columns
Electrical safety
The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 require the installation to be inspected and tested by a qualified person at least every five years. The report is usually an Electrical Installation Condition Report, or EICR. A new tenant must get a copy before they occupy, an existing tenant within 28 days of the inspection, and a council within 7 days of asking[1].
No new inspection is needed at changeover if the last was under five years ago and asked for no further investigative or remedial work. If it did, that work must be done within 28 days, or sooner if the report says so. Written confirmation from the qualified person who did it then goes to the tenant and council within 28 days[1]. Social tenancies are now covered too[1].
New electrical work in the void is separate. Replacing a fuse box, or work around a bath or shower, needs Building Regulations approval[11]. Either apply to building control, or use an electrician registered with a competent person scheme who self-certifies it[12]. Our guide to EICR and electrical certificates explains which document covers what.
Gas safety
Gas equipment the landlord supplies must be safely installed and maintained by a Gas Safe registered engineer, with a safety check on each appliance and flue every year. The tenant gets a copy of the record before moving in, or within 28 days of the check[2]. Gas work in the refurbishment, such as a new boiler, must also be done by a Gas Safe registered engineer. Ask to see their Gas Safe ID card, which confirms they are qualified for the work in question[13]. E&N Build Group arranges any gas work through a subcontracted gas engineer.
Smoke and carbon monoxide alarms
Under the Smoke and Carbon Monoxide Alarm (Amendment) Regulations 2022, in force since 1 October 2022, a rented home needs at least one smoke alarm on each storey with a room used as living accommodation. Any such room with a fixed combustion appliance, such as a gas or oil boiler or a log-burning stove, also needs a carbon monoxide alarm; gas cookers are excluded. Bathrooms and lavatories count as living accommodation[3].
For a new tenancy, the landlord must check, or have someone check, that each alarm is in proper working order on the day it begins. Faulty alarms must be repaired or replaced once reported and found to be faulty[3]. If the work moves a boiler or stove into a room used as living accommodation, that room needs an alarm.
Energy Performance Certificate and the minimum standard
You must have an EPC to rent out a property. It rates the home from A to G and is valid for 10 years[5]. Since 1 April 2020, a property covered by the minimum energy efficiency standard cannot be let, or continue to be let, below E unless a valid exemption is in place[4].
The government aims for as many privately rented homes as possible to reach band C or equivalent by 2030, and says it is exploring policy options following a consultation[4]. On 1 October 2026, the minimum GOV.UK gives is still E. A void suits energy work. Insulation in roof spaces or under timber floors needs no Building Regulations approval[11]. Once the work is done, an accredited assessor can issue a new EPC[5].
Paperwork for the new tenancy
For a new tenancy, you must give the tenant written information about its key terms before the tenancy is signed or agreed. If you do not, you could be fined up to £7,000[8]. Older checklists include the How to Rent guide: before 1 May 2026, a section 21 notice relied on the landlord having given it, with a gas safety certificate and an EPC[10]. Section 21 notices can no longer be issued from 1 May 2026[10]. Check GOV.UK's current list before each letting.
What drives the cost of void works?
No two voids cost the same. The main drivers are these.
- The level of work. A refresh needs one or two trades; a new kitchen and flooring bring in several.
- Condition at check-out. Hidden damp and failed old repairs add work, so price anything unseen as provisional.
- What the checks find. Remedial electrical work or a gas appliance that fails its check lands late in the void, when there is least time.
- Lead times. Late materials leave trades waiting.
- Access. Managed blocks of flats may set working hours, lift bookings or rules on removing waste.
- Fees outside the build. The EICR, the gas safety check, the EPC and any Building Regulations application are separate costs. Ask whether each quotation includes VAT.
Lost rent belongs in the same sum. A shorter void can justify ordering materials early.
Common problems at changeover
The leaving date moves. An earlier end must be agreed in writing[7].
The EICR finds remedial work. It has a 28-day deadline, or less if the report says so[1]. Do not book the inspection for the last day.
Alarms are painted over. Each must be in working order on the day the new tenancy begins[3]. Test them after the last trade leaves.
Damp appears under old flooring. Deal with it before the new tenant moves in, since you must keep the home free from health hazards[6].
Next steps
Start from the notice date and work back, booking the checks around the trades rather than after them.
The site visit and written quotation from E&N Build Group are free, and neither commits you to anything. With the quotation you get a written scope stating what is included, what is not, and what is provisional until the work opens up. Work runs in the order the trades need: structure, then services, then finishes. Anything that departs from the scope is agreed with you before it is built. At handover you receive the certificates and sign-offs that apply to the work done.
Plastering, floor tiling, wood flooring, kitchens, electrical work and plumbing can each be booked as a standalone job. Coverage is London, Surrey and surrounding counties, confirmed for each property from its postcode. Read more about refurbishment for landlords on our commercial work page.